Section 28 : FWD Fuse Ribs

Date Started 1/17/2012
Date Complete 2/5/2012
Time 57.25
Changes From Plans 
Assemble, and match drill parts.
If you are going to put in a tunnel access plate this would be a good time to do it.  I waited until later, and it took a lot more time, Airward makes one specifically for the side of the tunnel. See post: Right floorboard arrives & tunnel access panel
Form the control support.  Lots of cutting and filing to get it right.
Primed, reassembled and riveted.
test fit and match drill gear support in forward fuse rib.