Elevators

Part Started: 3/26/2011
Part finished: 6/24/2011
 
Time : 74.75 (.5 hrs on add-on's not on the plans).
Changes from plans:
  • Added extra nutplate next to one hinge on for an electrical bonding strap to go to the HS on each elevator.

Start to Finish of Elevators

posted Jun 24, 2011, 7:39 AM by Bill Thomasson   [ updated Jun 24, 2011, 7:50 AM ]

 
Elevators were very similar to the Rudder, although a lot more parts as you are building 2 of them, and 2 trim tabs.
Only the last couple rivets in each skin were difficult. I had Brian Michael's help again with the proseal steps which really helped.  The time period for the elevators is so long as I build the tailcone while waiting for Brian to be ready for the prosealing step, and then kept with the tailcone before going back to the elevators.